Notices · Solicitation
6130--Uninterruptible Power Supply (UPS) for East Indianapolis VA Clinic
Closed. Responses were due November 23, 2026, 8:30 AM ET.
| Solicitation number | 36C25027Q0037 |
|---|---|
| Notice type | Solicitation |
| Agency | VETERANS AFFAIRS, DEPARTMENT OF, 250-NETWORK CONTRACT OFFICE 10 (36C250) |
| Set-aside | Not listed |
| NAICS | 335999 All Other Miscellaneous Electrical Equipment and Component Manufacturing SBA size standard: 600 employees |
| Product or service code | 6130 Converters, Electrical, Nonrotating |
| Place of performance | Not listed |
| Posted | November 12, 2026 |
| Response due | November 23, 2026, 8:30 AM ET |
Who holds the work now
Largest current award in NAICS 335999 at the Department of Veterans Affairs, by dollars obligated: SACRAMENTO COMPUTER POWER, INC, current end date March 31, 2027. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read 36C25027Q0037 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
1 - SF 1449 is amended as follows: a) Block 20 - "30 days" is changed to "60 days" b) Block 28 is checked, quoter to sign and return 1 copy; quoters must sign block 30 and return to the CO c) Block 27a - FAR52.212-3 and FAR 52.212-5 were rescinded with the FAR Overhaul and are not applicable to this solicitation. 2 Section B.1 Invoices Paragraph 3(c) is changed to read: Other [X] After Acceptance. 3 Additional Requirements (page 7) is replaced as follows (affected words underlined). The product manufacturer s date cannot exceed 24 months (2 years) before the purchase order award date. The equipment must be unused and not refurbished, and it shall have the latest software and hardware updates installed by the manufacturer. Batteries included with the unit must have been manufactured within 6 (six) months of the purchase order award date. Service Manuals, including the theory of operation, maintenance requirements, repair information, schematics, part lists, and troubleshooting details, will be provided to the VA HTM Department in electronic format within three (3) days of delivery. Warranty information regarding parts and labor must be provided for all procured products in electronic format. Documentation must be sent to both the IOT&A contractor and the VA HTM Department within three (3) days of delivery. 4 Note on purchase order award date The government anticipates making the purchase order award in early December 2026. 5 Confidentiality and Non-Disclosure There was a discrepancy in original text. This amendment confirms that a Security Accreditation Package is not required. 6 Delivery Schedule - In the unlikely event of VA activation team delay that would impact the delivery schedule, the VA will provide 30-days notice of such delay. 7 - VAAR 852.219-77 and 852.219-78 do not apply to this solicitation since a subcontracting plan is not required. 8 - Regarding VAAR 852.239-75, Section 508 documentation is not required for this solicitation. 8 VAAR 852.247-74 is modified to read shipping line items 0001 and 0002 There are no other changes to this clause. ** End of Amendment 0001 to Solicitation 36C25027Q0037 **
Attachments
SAM.gov lists 3 files with this notice. Open them on SAM.gov, or ask Claude to read them.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Sources Sought | October 14, 2026 | October 20, 2026, 4:00 PM ET |
| Sources Sought | October 15, 2026 | October 22, 2026, 4:00 PM ET |
| Presolicitation | November 8, 2026 | |
| Solicitation | November 9, 2026 | November 23, 2026, 8:30 AM ET |
| Solicitation | November 9, 2026 | November 23, 2026, 4:30 PM ET |
| Solicitation | November 9, 2026 | November 23, 2026, 8:30 AM ET |
| Solicitation | November 9, 2026 | November 20, 2026, 4:00 PM ET |
| Solicitation | November 12, 2026 | November 23, 2026, 8:30 AM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.