Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

J012--Fire Suppression System Maintenance and

Open. Responses are due in 11 days, on December 8, 2026, 10:00 AM ET.

Solicitation number36C25027Q0078
Notice typeSolicitation
AgencyVETERANS AFFAIRS, DEPARTMENT OF, 250-NETWORK CONTRACT OFFICE 10 (36C250)
Set-asideNot listed
NAICS811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
SBA size standard: $12.5M average annual receipts
Product or service codeJ012 Maintenance, Repair and Rebuilding of Equipment: Fire Control Equipment
Place of performanceNot listed
PostedNovember 23, 2026
Response dueDecember 8, 2026, 10:00 AM ET

Who holds the work now

Largest current award in NAICS 811310 at the Department of Veterans Affairs, by dollars obligated: INNOVATION ASSOCIATES, INC., current end date August 27, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 36C25027Q0078 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 9 of 14 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationlowest price
36C25027Q0078.pdf, page 56: "The following factors will be used to evaluate offers: Price Alone"
Evaluation factorsPrice Alone
36C25027Q0078.pdf, page 56: "The following factors will be used to evaluate offers: Price Alone"
Questions dueNovember 17, 2026, COB
36C25027Q0078.pdf, page 1: "All RFIs must be submitted using the attached form to stacie.hill@va.gov by COB on 11/17/2026."
Site visitsee the quote
36C25027Q0078 0002.docx: "Offeror should make their own assessment during a scheduled site visit."
Contract typefirm-fixed-price
36C25027Q0078.pdf, page 6: "Recurring services shall be firm-fixed-price, with separately identifiable service categories in the pricing schedule."

The notice text

The text below is SAM.gov's own, unedited.

1. Monthly Fire Suppression Inspections PWS Sections 5, 6.1, and Appendix B The revised PWS shows Section 6.1 (Monthly Inspections) and the corresponding monthly inspection requirement in Appendix B as struck through. However, Sections 1 and 5 and Appendix A still reference monthly inspections. Could the Government please confirm whether the requirement for monthly inspections of all 10 fire suppression systems (120 inspections annually) has been officially removed, leaving only the semiannual maintenance and certification requirements? Leaving these references in was an error. All references to monthly inspections should be disregarded, as they are no longer required. 2. Monthly Reconciliation and Deficiency Log PWS Section 10 and Appendix B The revised Appendix B shows the monthly reconciliation and deficiency log deliverable as struck through, while Section 10 continues to require monthly reconciliation by the fifth business day of the following month. Could the Government confirm whether monthly reconciliation reports are still required, or whether this reporting obligation has been removed? We understand that service-specific deficiency reporting remains applicable. Section 10 is not referencing monthly inspections. It is references service reports. Since work is not being done monthly, the language should be revised to say, With each service report, the Contractor shall update the cumulative equipment inventory, service log, and deficiency log. Identify required services that were not completed, the reasons, and proposed completion dates. Update open deficiencies when corrective work is completed. A combined visit may satisfy multiple required activities only when each activity and its results are separately documented. A separate monthly reconciliation report is not required. 3. Existing Deficiencies and Six-Year Cylinder Maintenance PWS Section 9 The historical kitchen exhaust cleaning reports identify inaccessible duct sections, recommended access-panel installations, and other conditions requiring corrective action. Additionally, the October 2026 fire suppression inspection records identify six-year maintenance concerns affecting the Kidde dry-chemical systems, while the November 2026 maintenance documentation appears to address four cylinders. Could the Government please clarify: Whether the identified duct-access deficiencies will be corrected before the new contract begins or addressed separately through Contracting Officer-authorized corrective work. Whether the six-year maintenance requirements have been fully completed for all five Kidde IND-21 systems, or whether any outstanding work remains. Whether any unresolved pre-existing deficiencies should be excluded from recurring fixed-price services and handled through separate authorization under Section 9. The Six-Year maintenance deficiency was corrected on November 19th, 2026. The VA is not aware of any duct-access deficiencies, this was not listed in the previous report to the one you referenced and may be an administrative error. Offeror should make their own assessment during a scheduled site visit.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationNovember 5, 2026December 1, 2026, 10:00 AM ET
PresolicitationNovember 5, 2026December 1, 2026, 10:00 AM ET
SolicitationNovember 5, 2026December 1, 2026, 10:00 AM ET
SolicitationNovember 18, 2026December 8, 2026, 10:00 AM ET
SolicitationNovember 18, 2026December 8, 2026, 10:00 AM ET
SolicitationNovember 23, 2026December 8, 2026, 10:00 AM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.