Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Combined Synopsis/Solicitation

H361--LEX Triannual Energy Study and ARC Flash Testing

Open. Responses are due in 6 days, on December 3, 2026, 12:00 PM ET.

Solicitation number36C24927Q0038_0001
Notice typeCombined Synopsis/Solicitation
AgencyVETERANS AFFAIRS, DEPARTMENT OF, 249-NETWORK CONTRACT OFFICE 9 (36C249)
Set-asideService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
NAICS238210 Electrical Contractors and Other Wiring Installation Contractors
SBA size standard: $19M average annual receipts
Product or service codeH361 Inspection- Electric Wire and Power Distribution Equipment
Place of performanceLexington, KY 40511, USA
PostedNovember 22, 2026
Response dueDecember 3, 2026, 12:00 PM ET

Who holds the work now

Largest current award in NAICS 238210 at the Department of Veterans Affairs, by dollars obligated: DANIELS BUILDING CO INC, current end date February 14, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 36C24927Q0038_0001 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from 8 of 21 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Site visitNovember 16, 2026
36C24927Q0038 0001.docx: "Site visits are scheduled on Monday 11/16/2026 at 08:30am ET for the Lexington Sousley Campus"
Site visitNovember 17, 2026
36C24927Q0038 0001.docx: "Tuesday 11/17/2026 at 08:30 AM ET for the Lexington Troy Bowling Campus, 1101 Veterans Dr., Lexington, KY 40502 in the main lobby."
Contract number named36C24923P0897
Bowling VA Combined Test Report 2023.pdf, page 59: "Triennial Electrical Maintenance, Inspection & Arc Flash Testing, Contract No. 36C24923P0897"
Contract number named36C24920P0633
Bowling VA Combined Test Report 2023.pdf, page 100: "(407)427-0436 Contract No. 36C24920P0633"

The notice text

The text below is SAM.gov's own, unedited.

This amendment is to publish Questions and Answers as submitted in accordance with instruction on RFQ 36C24927Q0038 and also to extend the offer due date: 12/03/2026 @ 11:00 (CT). No other changes are made at this time. Questions and Answers Q.1. Page 1 of the solicitation lists November 30, 2027, at 11:00 AM CST, which is also the deadline currently displayed on SAM.gov. However, page 20 of the solicitation states November 30, 2026, at 11:00 AM CT. Could you please confirm the correct quote submission deadline? A.1. See Amendment 36C24927Q0038_0001, offer due date corrected. The date and time shown on page 1 are system-generated, the solicitation deadline remains 11:00 a.m. local time for the contracting office in Murfreesboro, Tennessee. Currently (in November), CT (Central Time) or CST (Central Standard Time) are both used, but CST is technically accurate right now because Daylight Saving Time ended in early November, putting the region on Central Standard Time. The offer due date and time is 10/30/2026 @11:00 CT. Q.2. VAAR 852.219-75 is incorporated by reference, and the requirement is solicited under NAICS 238210. Please confirm which limitation on subcontracting applies to this award: services at 50 percent, or special trade construction contractors at 75 percent. Please also confirm whether the signed certificate is to be returned with the quote. A.2. Yes, the clause is included and will be included in the order in full text for completion prior to award. Q.3. For the technical subfactors and for past performance, please confirm whether the Government will consider the personnel, certifications, experience, references and prior studies of a proposed first-tier subcontractor together with those of the prime. A.3. Submit the information in detail as “prime” or subcontractor. FAPIIS (Federal Awardee Performance and Integrity Information System) reports will be evaluated. Q.4. Please confirm that attendance at the November 16 and 17 site visits is optional and is not a condition of submitting a quote. A.4. Attendance is optional. Q.5. Line item 1002 covers emergency repair work if circuits cannot be energized after inspection. Please advise the pricing basis the Government wants for this line item, for example a not-to-exceed amount set by the Government, hourly rates with an estimated quantity, or a single lump sum, so that all quotes are priced on the same basis. A.5. CLIN 1002 provides an estimated amount for emergency repair funding. If emergency repairs become necessary, all repair costs and funding must be approved by the Station and the Contracting Officer (CO) before work is performed. Although the total cost of such repairs cannot be determined in advance, including this CLIN and associated funding is necessary because the Statement of Work (SOW) requires the Contractor to perform emergency repairs when needed and supports the award of the contract. Q.6. Please confirm whether the Government will accept a partial invoice after acceptance of field testing at each campus and a final invoice after acceptance of the studies and final report. A.6. Invoicing is in arrears, no partial invoices are to be accepted prior to all work is completed and final acceptance. Q.7. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number? A.7. This is a new requirement, although this study is completed triennially the contract does not have any options. Q.8. Can our references be for work our owner performed or managed while at a prior employer? A.8. No employee references are requested. The vendors Past performance is requested. Q.9. Is a Kentucky electrical license required, or will licenses from another state work? A.9. Need to have a master electrician on shift while work is being performed. Kentucky license is required. Q.10. SOW Section 7 calls for oil and coolant samples on "three existing generators." The attachments show at least three at Bowling and six at Sousley. Which three are included? A.10. The VA requests oil and coolant samples on all generators. Q.11. SOW Section 6, item k says emergency repairs are paid by change order or separate PO. What should we put in CLIN 1002? Is connector replacement found during the IR scan in the base price? A.11. See A.5 for CLIN 1002. Yes, connector replacement found during the IR scan is part of the base scope. SOW Section 7 (Infra-Red Scanning) says problem connections shall be replaced with new connectors and/or tightened to the manufacturer's specifications. Q.12. Who approves the consultant for the short-circuit, coordination and arc flash studies, and when? A.12. Technical review by the COR/Engineering Service, will approve the consultant as part of the technical acceptability evaluation. Q.13. SOW Section 6, item h asks for every worker's OEM training documents at the time of offer. With the 5-file, 8 MB limit, can we send a summary with the quote and the full documents before work starts? A.13. SOW Section 6, item h requires OEM training documentation to be submitted at the time of offer. Per SOW Section 2, NFPA 70E qualified person certifications shall be submitted to the Contracting Officer before work begins. Q.14. Is the 4-hour test date set? A.14. TBD Q.15. Will the site visit sign-in sheets and minutes be posted? A.15. No notes or sign in sheet will be posted. Q.16. Scope – Panelboards - SOW Section 3 lists "Distribution Panels" among the equipment to be maintained and tested, while the Equipment List paragraph applies the procedures to all equipment in the attached electrical studies, which include several hundred branch panelboards. Is hands-on maintenance and testing (e.g., torque verification, breaker testing) required on every branch panelboard, or is an energized infrared scan and visual inspection sufficient for branch panelboards, with full testing limited to distribution panels? A.16. Full maintenance and testing in accordance with SOW Section 7 and NETA MTS, including breaker testing and connection torque verification, is required for the switchboards and distribution panels listed in SOW Section 3. For branch panelboards the required scope is an energized infrared scan, a visual inspection and exercising of the breakers. Branch-panel connections or breakers with thermal anomalies or visual defects shall be investigated and corrected per SOW Section 7 (Infra-Red Scanning). Routine de-energized torque verification and breaker testing are not required on every branch panelboard. Q.17. Scope – Panelboards - The Infra-Red Scanning section references bus plugs, panelboards, MCCs and transformers in the Main, Tower and Chiller buildings. Does the infrared scan also apply to the panelboards in the Sousley Division buildings? A.17.Yes it does. Q.18 . Scope – Equipment Inventory - The SOW references a Government-furnished inventory of equipment to be maintained, inspected and tested. Is there an inventory beyond the arc flash study data files and 2023 test reports attached to the RFQ? If so, can it be provided? A.18. The SOW lists a Government-furnished inventory as an attachment. Per the SOW Equipment List paragraph, any equipment in the facility that is not shown in the attached studies shall also be tested and maintained. Mark its information and location on a hard copy of the studies and turn it in with the report. Q.19. Scope – Equipment Inventory - The 2023 test reports include medium-voltage equipment not shown in the arc flash study data files (for example, Bowling Tower and Main Hospital transformers T2–T6, MV switches T1–T4 and network protectors, and the Sousley Building 68 medium-voltage switchgear). Please confirm this equipment is included in both the maintenance/testing scope and the arc flash and coordination study. A.19. Yes. SOW Section 3 includes medium-voltage switches, medium-voltage circuit breakers, liquid-filled transformers and switchgear. The Equipment List paragraph requires testing of equipment that exists in the facility even if it is not shown in the attached studies. The arc flash study covers high- and low-voltage systems, with field-verified data, for the Bowling Chiller, Main and Tower buildings and all Sousley buildings. The short circuit and coordination study covers each protective device back to the utility and generator sources. Q.20. Scope – Generators and Transfer Switches - The Power Generators section calls for oil and coolant sample testing of "the three existing generators." The study data shows generators serving multiple buildings at both divisions. Please identify the three generators (division, building and unit ID) included in this requirement. A.20. The Va requests oil and coolant samples on all generators. Q.21. Scope – Generators and Transfer Switches - The SOW requires ASCO transfer switches to be tested and maintained by ASCO technicians. Can the VA provide a list of the ASCO units at each division? A.21. The majority of ATS on both campuses are from ASCO. Q.22. Schedule and Deliverables - Normal working hours are listed as 7:00 AM–4:30 PM ET in SOW Section 5 and 8:00 AM–4:30 PM ET in the Work Hours section. Please confirm which applies. A.22. 7:30 AM–4:30 PM is normal business hours. Outages should occur after hours. Q.23. Schedule and Deliverables - The general test report calls for four (4) hard copies, while the arc flash study report calls for three (3). Please confirm the required number of hard copies for each deliverable. A.23. These are separate deliverables. Maintenance and testing report: one (1) hard copy to the Contracting Officer, plus software copy, four (4) hard copies and one (1) CD-ROM/DVD (Microsoft Word) to the Chief of Engineering Service, within seven (7) calendar days. Arc flash study report: software copy, three (3) hard copies and one (1) electronic copy on CD or DVD. Protective device study certification: four (4) copies to the Resident Engineer two weeks before final inspection. Q.24. Evaluation - Section (ix) describes a Lowest Price Technically Acceptable process, while other language references best value and price and other factors considered (FAR 12.204). Please confirm which evaluation method will be used. A.24. "Best Value" is not an evaluation method used under Simplified Acquisition Procedures. For this acquisition, award will be made using the Lowest Price Technically Acceptable (LPTA) methodology. “Best value” is a general procurement concept that means the Government seeks the proposal that provides the greatest overall benefit in accordance with the requirements and evaluation criteria established in the solicitation. Under FAR Part 12 Simplified Acquisition Procedures, proposals are evaluated as either technically acceptable or unacceptable. Once a proposal is determined to be technically acceptable, additional technical superiority generally does not provide added value in the evaluation. As a result, award is made to the lowest-priced, technically acceptable offeror. I believe the confusion may stem from the term "Best Value Tradeoff" found in FAR / RFO Part 15. Which does not apply to this acquisition. Q.25. The Statement of Work lists a Government-furnished inventory of electrical equipment. Can the inventory or equipment counts by campus be provided to quoters? A.25. See A.18. The SOW does not give equipment counts by campus. Q.26. Price Schedule line 1001 lists only the Bowling Campus, but the Statement of Work covers Bowling and Sousley. Please confirm both campuses are included, and whether they should be priced as one line or separately. A.26. Yes, SOW Section 1 covers both the Bowling Campus and the Sousley Campus. Q.27. Line 1002 (emergency repair) states additional payment is by change order. May quoters price this line as hourly rates? A.27 See A.5 Q.28. The Statement of Work makes the contractor responsible for utility company costs for the 4-hour EES test and fees for

The rest of the text is on SAM.gov.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
Combined Synopsis/SolicitationNovember 8, 2026November 30, 2026, 12:00 PM ET
Combined Synopsis/SolicitationNovember 22, 2026December 3, 2026, 12:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.