Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

Y1DZ--598-22-115 Site Utility Infrastructure-NLR

Open. Responses are due in 49 days, on January 15, 2027, 5:00 PM ET.

Solicitation number36C25626R0084_1
Notice typeSolicitation
AgencyVETERANS AFFAIRS, DEPARTMENT OF, 256-NETWORK CONTRACT OFFICE 16 (36C256)
Set-asideService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
NAICS237110 Water and Sewer Line and Related Structures Construction
SBA size standard: $45M average annual receipts
Product or service codeY1DZ Construction of Other Hospital Buildings
Place of performanceNorth Little Rock, AR 72114, USA
PostedNovember 18, 2026
Response dueJanuary 15, 2027, 5:00 PM ET

Who holds the work now

Largest current award in NAICS 237110 at the Department of Veterans Affairs, by dollars obligated: BOYER COMMERCIAL CONSTRUCTION INC, current end date July 25, 2028. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 36C25626R0084_1 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from all 7 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationtradeoff (factors other than price can outweigh price)
SOLICITATION_36C25626R0084_1.pdf, page 11: "This is a Past Performance-Price Tradeoff (PP/P). Past Performance is significantly more important than price."
Evaluation factorsPast Performance; Price
SOLICITATION_36C25626R0084_1.pdf, page 11: "Past Performance is significantly more important than price."
Questions dueDecember 11, 2026, 12:00PM CT
SOLICITATION_36C25626R0084_1.pdf, page 8: "DECEMBER 11, 2026, at 12:00PM CT or Time as amended and will"
Site visitDecember 8, 2026
36C25626R0084 0001.pdf, page 1: "Site Visit: extended to 12/08/2026 at 1PM Central Time. Meeting location remains the same."
Site visitsee the quote
Attachment B_NLR VA Specifications.pdf, page 10: "B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer."
Site visitDecember 1, 2026, optional
SOLICITATION_36C25626R0084_1.pdf, page 8: "Attendance at the site visit is not mandatory but highly suggested for proper proposal preparation."
BondingPerformance & Payment Bonds
Attachment B_NLR VA Specifications.pdf, page 27: "B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period"
BondingPerformance Bond (SF 25) and Payment Bond (SF 25A), each in the penal sum of 100% of the award amou…
SOLICITATION_36C25626R0084_1.pdf, page 7: "The offeror to whom award is made will be required to furnish two bonds, a Performance Bond, SF 25, and a Payment Bond, SF 25A, each in the penal sum of 100% of the award amount."
BondingBid guarantee of 20 percent of offer price, not to exceed $3,000,000
SOLICITATION_36C25626R0084_1.pdf, page 7: "An offer Bid guarantee is required in an amount not less than 20 percent of the offer price"
Past performanceScheduling consultant: five years as lead project scheduler or previous scheduling experience on at…
Attachment B_NLR VA Specifications.pdf, page 43: "The scheduling consultant must have five (5) years of experience as a lead project scheduler or previous scheduling experience on at least three (3) projects of similar size and scope."
Past performancePhotographic documentation provider: minimum three years of experience in operation
Attachment B_NLR VA Specifications.pdf, page 39: "Demonstrable minimum experience of three (3) years in operation providing documentation and advanced indexing/navigation systems"
Past performanceMinimum of 3 previous lead paint removal projects similar in scope
Attachment B_NLR VA Specifications.pdf, page 236: "The Contractor performing the lead paint removal work shall have performed a minimum of 3 previous lead paint removal projects similar in scope of this project."
Past performance1 more in the files, not shown here.
Contract typefirm-fixed-price
SOLICITATION_36C25626R0084_1.pdf, page 16: "The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation."

The notice text

The text below is SAM.gov's own, unedited.

11/19/2026, Amendment 0001: The purpose of this amendment is to advise all offerors of the following changes to the solicitation regarding date extensions: Site Visit date: 12/08/2026. RFIs due date: 12/18/2026. Proposal due date: extended to 01/15/2027. See attached PDF, 36C25626R0084 0001. No other changes were made via this amendment. _____________________________________________________________________________________________________ This procurement will be issued as a 100% Set-Aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) through RFP procedures under FAR 15. The Central Arkansas Veterans Healthcare System (CAVHS) has a requirement Upgrade/Replace Site Utility Infrastructure, Project #598-22-115. The period of performance is 720 calendar days after issuance of the Notice to Proceed. Location of the work is at the Eugene J. Towbin (EJT) VA Healthcare Center, 2200 Fort Roots Drive, North Little Rock, AR 72114. The point of contact for this notice is Contract Specialist, Julius Jones at Julius.Jones@va.gov.Telephone requests will NOT be accepted. 237110 – Water and Sewer Line and Related Structures Construction. is applicable to the RFP and the Small Business Size Standard is $45M. Interested offerors are asked to first read over the RFP and all its associated attachments/documents in their entirety prior to forwarding any questions to the Contracting Officer. A cut-off time/date for receipt of questions will be established and listed in the RFP, as well as a time/date for the scheduled Site Visit. Only one Site Visit will be conducted and no requests for additional Site visits or make-up Site Visits will be granted. Amendments to the RFP will not be mailed but will be posted at the SAM.gov website. Offerors are responsible for obtaining the RFP (and associated documents/attachments) from the SAM.gov website and for acknowledging all amendments to the RFP. It is the responsibility of all interested offerors to check the SAM.gov website as necessary for any Amendments to the RFP (to include the day bids are due). In accordance with VAAR 819.7003 Eligibility, at the time of submission of a proposal, the offeror must represent to the Contracting Officer that it is a SDVOSB concern, that it is a small business concern under the NAICS Code assigned to the acquisition, and that it is verified for eligibility in the Small Business Association website (Veteran Small Business Certification (VetCert)) and have the Veterans Small Business Certification. SDVOSB concerns must also be registered in the System for Award Management (SAM) database at www.sam.gov. OFFERORS ARE ADVISED TO CHECK THE SITE FREQUENTLY AS THEY ARE RESPONSIBLE FOR OBTAINING AMENDMENTS TO THE SOLICITATION NOTICE. In accordance with FAR Overhaul 5.101(c)(4)(v), equitable adjustments for change orders will be reviewed per FAR 36 and 43.

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationNovember 16, 2026January 5, 2027, 5:00 PM ET
SolicitationNovember 18, 2026January 15, 2027, 5:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.