Every answer cites notice numbers you can check on SAM.gov. See a real answer

Notices · Solicitation

763-25-700 EHRM Infrastructure Upgrades Construction Dallas CMOP, TX

Open. Responses are due in 26 days, on December 23, 2026, 1:00 PM ET.

Solicitation number36C77626B0028_1
Notice typeSolicitation
AgencyVETERANS AFFAIRS, DEPARTMENT OF, PCAC (36C776)
Set-asideService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
NAICS236220 Commercial and Institutional Building Construction
SBA size standard: $45M average annual receipts
Product or service codeY1DZ Construction of Other Hospital Buildings
Place of performanceDallas, TX 75216, USA
PostedNovember 16, 2026
Response dueDecember 23, 2026, 1:00 PM ET

Who holds the work now

Largest current award in NAICS 236220 at the Department of Veterans Affairs, by dollars obligated: WALSH CONSTRUCTION COMPANY II, LLC, current end date March 25, 2027. It may not be the contract this notice replaces.

Source: USAspending.gov, as of November 3, 2026.

Ask Claude about this notice

Add BidOpps AI to Claude, then type this:

Using BidOpps AI, read 36C77626B0028_1 in full and tell me what stage it's at.

Add to Claude

Your first 10 searches are free. No card.

From the attachments

Pulled by AI from all 7 files with text. Check the file before relying on a fact. A point with no row here was not found, which does not mean it doesn't apply. Each quote is the file's own words.

Evaluationlowest price
36C77626B0028_1.pdf, page 11: "Award may only be made to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price (see RFO 52.214-19)."
Evaluation factorsprice only
36C77626B0028_1.pdf, page 11: "considering only price (see RFO 52.214-19). The low price will be evaluated by the contracting officer prior to award to confirm it is fair and reasonable."
Questions dueNovember 20, 2026, 1:00 PM ET
36C77626B0028_1.pdf, page 8: "THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS November 20, 2026, at 1:00 PM ET."
Site visitsee the quote
Attachment 1 - EHRM Final Specifications.pdf, page 6: "Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer."
Site visitoptional
36C77626B0028_1.pdf, page 8: "All potential bidders, subcontractors, and suppliers are strongly encouraged to attend this site visit."
Bondingperformance and payment bonds
Attachment 1 - EHRM Final Specifications.pdf, page 18: "Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period."
Bondingbid guarantee (SF 24)
36C77626B0028_1.pdf, page 6: "A Bid Guarantee, Standard Form 24 (SF 24), is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000."
Bondingperformance bond (SF 25) and payment bond (SF 25A)
36C77626B0028_1.pdf, page 7: "The offeror to whom award is made will be required to furnish two bonds. A Payment Bond shall be provided on Standard Form 25A (SF 25A) and a Performance Bond shall be provided on Standard Form 25 (SF 25)."
Past performanceprior construction projects of similar size and scope
Attachment 1 - EHRM Final Specifications.pdf, page 30: "A representative sample of prior construction projects, which the proposed consultant has performed complete project scheduling services."
Past performanceMinimum three (3) years' experience as installer
Attachment 1 - EHRM Final Specifications.pdf, page 198: "An experienced installer with a minimum of three (3) years’ experience and who has specialized in installing joint sealants similar in material, design, and extent"
Past performanceMinimum two years' experience in construction field inspections of firestopping
Attachment 1 - EHRM Final Specifications.pdf, page 193: "to have a minimum of two years’ experience in construction field inspections of firestopping systems, products, and assemblies."
Contract typefirm-fixed-price
Attachment 1 - EHRM Final Specifications.pdf, page 33: "Article, FAR 52.232 – 5 (PAYMENT UNDER FIXED-PRICE CONSTRUCTION CONTRACTS)"

The notice text

The text below is SAM.gov's own, unedited.

EHRM Infrastructure Upgrades Construction – Dallas CMOP

Attachments

The files SAM.gov lists with this notice. Open them on SAM.gov, or ask Claude to read them.

What SAM.gov has posted, oldest first

NoticePostedResponse due
SolicitationNovember 9, 2026December 23, 2026, 1:00 PM ET
SolicitationNovember 16, 2026December 23, 2026, 1:00 PM ET
SolicitationNovember 16, 2026December 23, 2026, 1:00 PM ET

Open solicitations like this one

Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.