Notices · Presolicitation
Calexico LPOE Gantry Roof Repair
Open. Responses are due in 12 days, on December 9, 2026, 7:00 PM ET.
| Solicitation number | EQPMBE-27-0054 |
|---|---|
| Notice type | Presolicitation |
| Agency | GENERAL SERVICES ADMINISTRATION, PUBLIC BUILDINGS SERVICE, PBS PROJECT DELIVERY ZONES 5-7 - PACIFIC NORTHWEST & PACIFIC SOUTHWEST BRANCH |
| Set-aside | Small Business Set Aside - Total (SBA) |
| NAICS | 236220 Commercial and Institutional Building Construction SBA size standard: $45M average annual receipts |
| Product or service code | Z2AA Repair or Alteration of Office Buildings |
| Place of performance | Calexico, CA 92231, USA |
| Posted | November 23, 2026 |
| Response due | December 9, 2026, 7:00 PM ET |
Who holds the work now
Largest current award in NAICS 236220 at the Public Buildings Service, by dollars obligated: CLARK CONSTRUCTION GROUP LLC, current end date April 17, 2028. It may not be the contract this notice replaces.
Source: USAspending.gov, as of November 3, 2026.
Ask Claude about this notice
Add BidOpps AI to Claude, then type this:
Using BidOpps AI, read EQPMBE-27-0054 in full and tell me what stage it's at.
Your first 10 searches are free. No card.
The notice text
The text below is SAM.gov's own, unedited.
In accordance with FAR 5.101(b)(1)(i), this is a 15 day presolicitation notice that GSA will solicit contractors to install new Tremco AlphaGuard system or approved equivalent on the Gantry Building at the Calexico East Land Port of Entry (CA0540WW) in Calexico, CA. The work encompasses surface preparation, substrate repairs, flashing details, joint sealing, priming, and the application of a high-performance, two-component, bio-based polyurethane liquid-applied roof system (Tremco AlphaGuardTM BIO System) reinforced with stitchbonded polyester fabric (Tremco Permafab®). The primary purpose of this project is to restore waterproofing integrity, address seam and detail vulnerabilities, enhance solar reflectance, and extend the service life of the roof system without requiring a costly tear-off, while minimizing VOC emissions and odors during construction in an occupied federal facility.
What SAM.gov has posted, oldest first
| Notice | Posted | Response due |
|---|---|---|
| Presolicitation | November 23, 2026 | December 9, 2026, 7:00 PM ET |
Open solicitations like this one
Source: this notice on SAM.gov, from SAM.gov's public extract of contract notices, last loaded November 27, 2026.